LPG Reticulation

LPG Reticulation - Piped Gas Systems

Continental Experts designs, supplies, installs, tests, documents, and hands over piped LPG systems for developments and managed properties across Kenya.

Central LPG tank connected to regulators, gauges, valves, and organised pipework

Engineering approach

Coordinated gas infrastructure.

LPG reticulation brings storage, regulators, isolation and safety equipment, and permanently installed pipework into one coordinated building system. Early planning helps align tank location, access, ventilation, pipe routes, appliances, and safety controls with the wider property.

Designed, tested, documented.
Protected LPG bulk storage tank installed at a managed property

Storage

Bulk tanks and cylinder arrangements planned around demand, access, ventilation, and protection.

LPG pressure regulator assembly with pressure gauges and connected pipework

Regulators

Pressure regulation and monitoring equipment selected for the source and downstream system.

LPG safety devices including a detector, solenoid valve, alarm, and pressure gauge

Safety devices

Detection, alarms, and automatic shut-off equipment coordinated with the installation.

Manual LPG isolation valve installed on organised gas pipework

Isolation

Accessible isolation points positioned to support safe operation, response, and servicing.

Developers get a pressure-tested, fully documented system handed over with complete compliance records.

Why centralise the supply?

A simpler gas arrangement for the property.

Centralised LPG piping brings storage, delivery, and points of use into one coordinated arrangement instead of leaving each home or operating area to manage cylinders separately.

Fewer cylinder exchanges

A centralised arrangement can remove the need for residents, kitchen teams, or facilities staff to exchange cylinders at individual points of use.

Planned continuity

Storage capacity, expected demand, delivery access, and replenishment responsibility are considered together to support continuity of supply.

Bulk and metered potential

Where the project design supports it, bulk purchasing and metered usage can make supply allocation and operating responsibilities clearer.

Three rendered views of an LPG refilling skid system with storage vessel, dispenser, hoses, guard rails, and fire extinguishers
LPG refilling skid arrangement showing the storage vessel, dispensing equipment, hoses, protection, and safety equipment.

LPG refilling

We also provide LPG refilling systems.

Our LPG infrastructure service also includes refilling skid systems for suitable commercial and operational requirements. We help clients assess the storage vessel, dispenser, hoses, protection, access, and safety equipment as one coordinated refilling arrangement.

Where it fits

Built around the property and the people responsible for it.

The right arrangement depends on demand, available space, delivery access, appliances, and how the site will be operated after handover.

Residential developments

Centralised gas infrastructure for apartment schemes, townhouses, villas, and individual homes, coordinated with kitchens, fireplaces, and shared service areas.

Hospitality and commercial properties

Piped gas distribution planned around commercial kitchens, operating teams, delivery access, and the wider building services.

Education and institutional sites

Coordinated LPG and specialist gas piping for active campuses, laboratories, diplomatic residences, and other managed facilities.

Project and facilities teams

A clear delivery path for developers, homeowners, architects, consultants, project managers, and the teams responsible after handover.

End-to-end delivery

From first assessment to supported handover.

We treat the installation as an engineered building system, with clear decisions and records at each stage.

01-05 / LPG DELIVERY PATH

Gas project professionals reviewing a residential site, access, and LPG storage arrangement

Assess

Project and site review

We review the intended use, site conditions, access, expected demand, and coordination requirements before defining the scope.

Gas engineer and architect planning a coordinated LPG system over technical drawings

Design

System planning

We plan the storage arrangement, regulators, isolation and safety equipment, and pipe routes as one coordinated building system.

Technicians installing LPG pipework, regulators, and valves at a managed property

Deliver

Supply and installation

Our team supplies and installs the agreed equipment and pipework in coordination with the wider project team.

Technicians pressure-testing LPG pipework and recording the system results

Verify

Testing and documentation

The installed lines and safety components are pressure-tested, checked, and recorded before handover.

Gas engineer explaining a completed LPG installation to a property team during handover

Support

Handover and aftercare

The client receives system documentation and operating guidance, with maintenance and service support available after handover.

Start with a site assessment

Ready to plan your LPG reticulation system?

Tell us about the property, intended use, and project stage so we can help define the right next step.

Request a project assessment

Relevant project experience

Reticulation across varied environments.

Selected delivered work across residential developments and a diplomatic residence.

Residential developer

Ineza, Runda

Scope

Gas reticulation for 122 units, covering kitchen and gas fireplace connections, specialised piping for individual unit connections, gas leak detection systems, and full compliance with safety and regulatory standards.

Outcome

Delivered in full - the project that established Continental Experts' reputation and referral network.

Diplomatic/institutional

US Embassy Residence, Nairobi

Scope

Installation, testing, and commissioning of a complete LPG reticulation system serving two fireplaces and a commercial kitchen. The works included gas piping, fittings, regulators, safety equipment including gas leak detectors, and integration with the residence’s existing infrastructure to meet the required safety and performance standards.

Outcome

Completed to specification, with the project team commended for technical competence, professionalism, coordination, strict safety and quality assurance, attention to detail, and delivery of a technically demanding installation.

Residential apartment development

Sunstone Apartments, Westlands

Scope

Gas reticulation to the kitchens serving all 52 apartments.

Outcome

Kitchen gas reticulation delivered across the full apartment development.

LPG project assessment

Planning a centralised LPG system?

Tell us about the property, intended gas use, project stage, and the teams involved. We will help clarify the right next step for assessment, design, installation, or ongoing support.